Heavy Haul Dispatch, Job-Site Staging & Axle Weight Optimization
Coordinate flatbeds, cranes, cement, and bulk materials with job-site delivery windows, weight limit calculations, and proof of offload.
Industry Challenges & Solutions
How Pegasus addresses specific distribution friction
Core Operating Bottlenecks
- Strict gross vehicle weight (GVW) and axle weight limit regulations
- Job-site access restrictions, unpaved surfaces, and required crane/forklift staging
- High demurrage costs when delivery trucks are delayed waiting for contractor equipment
The Pegasus Solution
Weight & Axle-Aware Dispatch
Pegasus calculates cumulative payload weights against truck capacities, preventing overweight fines and uneven cargo distribution.
Live Contractor ETA Tracking
Job-site foremen receive real-time SMS and map links with precision ETAs so offloading equipment is staged before the truck arrives.
Photo Proof of Offload
Drivers photograph offloaded materials and drop locations on job sites, attaching high-res images to delivery receipts to eliminate claims.
Standard Operating Procedure
End-to-end execution lifecycle in Pegasus
Orders are weighed at the yard scale; Pegasus checks truck payload limits.
Routes account for commercial truck height, weight, and bridge restrictions.
Automated alert sent when truck is 20 minutes from job site for crane prep.
Driver photographs placed pallets and captures supervisor digital signature.
Frequently Asked Questions
Does Pegasus support split deliveries across multiple job sites?
Yes. Our vehicle routing solver sequences multi-stop drops in reverse load order so materials at the back of the flatbed are accessible first.
Schedule an Industry Walkthrough
See how Pegasus configures building materials & heavy freight workflows, prevents dropped handoffs, and unlocks real-time operational visibility.
